Technical Validation Before Quoting a Gate
The best time to find an incompatible component or unsupported assumption is before the customer receives a commercial promise.
Check survey completeness
Confirm dimensions, levels, movement space, supports, access, power and relevant evidence. Assign every unresolved condition.
Review configuration coherence
Ensure gate type, leaf arrangement, dimensions, design and operating direction describe the same proposed system.
Verify products against current data
Compare selected motors, hinges, controls and safety products with current manufacturer information and the intended duty and environment.
Resolve rules and professional checks
Correct blocking errors, review warnings and record any approved exception. Escalate structural, electrical, safety and compliance matters to competent people.
Authorise the commercial handover
Only move to pricing when the remaining assumptions are visible and acceptable. Technical approval should identify the configuration or revision reviewed.